We are very excited about our new Development. We hope you will enjoy seeing the Nursing Home take shape and we will endeavour to keep you posted on all developments.
The CField Team have now installed the pre-cast slabs for the ground floor and also commenced installing the floors for the first floor. Structural steel beams and columns have been installed and RC columns and beams have been poured to first floor level.
All construction vehicles will access the site at a dedicated construction entrance during each phase of the project. As part of our site set up we have erected signage to let everyone know which entrance is to be used for the main entrance to Nazareth Care Home and the Construction Traffic only entrance we ask that you please adhere to these access routes in the drawing below.